Project Details
We partnered with American Electric Power to construct specialized containment cells for fly ash placement, supporting the safe management and long-term storage of byproduct materials. Our work included the relocation and replacement of existing fly ash, ensuring continuity of operations while upgrading containment infrastructure.
This project leveraged our expertise in engineered cell construction, the installation of plastic liner systems, and the precise segregation and placement of fly ash material in accordance with environmental and regulatory requirements. From excavation through final placement, each phase was executed with a focus on safety, compliance, and environmental protection.
- DateMarch 2015 - June 2015
- Cost$3 mil
- ExpertiseFly Ash Pond Construction